From: Mike Schmidt Subject: [IGSMAIL-251] Software Upgrade at DRAO Date: 6 MAY 1993 08:15:11 IGS Electronic Mail 6-MAY-1993 08:15:11 Message Number 251 *********************************************************************** From: Mike Schmidt Subj: Software Upgrade at DRAO ------------------------------ ************************************************************************* ADVISORY The GPS tracker DRAO (Penticton, BC Canada) was shut down on DAY 125 from 17:08 UT until 18:44 UT to permit a software upgrade. New PROMS were installed and a calibration carried out. The upgrade should solve the problem of biases in pseudo ranges to certain SV's under A/S. New calibration value is -7.679 nsec; (previous value -7.586 nsec); Please address any questions to: *************************************************************************** Mike Schmidt Pacific Geoscience Centre Geological Survey of Canada 9860 West Saanich Rd. PO Box 6000, Sidney BC V8L 4B2 TEL (604) 363-6760 FAX (604) 363-6565 internet: schmidt@pgc.emr.ca ***************************************************************************