From: T. Clark Subject: [IGSMAIL-367] Operations change at GODE (Goddard) Date: 8 NOV 1993 09:58:24 IGS Electronic Mail 8-NOV-1993 09:58:24 Message Number 367 *********************************************************************** From: T. Clark Subj: Operations change at GODE (Goddard) ------------------------------------------- Discussions at and following the IGS Operations Workshop between Miranda Chin, Steve Dinardo and I led to the decision to make change in the data download and control of the TurboRogue at the GODE pier at the Goddard Geophysical & Astronomical Observatory (GGAO). Since last spring GODE had been included in the CIGNET list, but it was decided to have the operations control transferred to the JPL/FLINN operation. This change-over was accomplished at about 16:00 UTC on November 5 by Steve Dinardo (at the JPL end) and Chuck Kodak & me (at the GGAO end). At present the access is by dial-up modem (Trailblazer) but we hope to change the access to Internet RSN (Real! Soon! Now!) as soon as the GGAO Internet connection is working and as soon as some minor tweaks are make to the TurboRogue firmware. Thanks to Miranda and all the NOAA group for their dilligence in handling the care and feeding of GODE over these past few months. Regards, Tom Clark