[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
[IGSMAIL-0615] Westford/WFRD Antenna Test Updates
- Subject: [IGSMAIL-0615] Westford/WFRD Antenna Test Updates
- From: Miranda Chin/CIGNET
- Date: Mon, 23 May 1994 12:42:30 PDT
******************************************************************************
IGS Electronic Mail Mon May 23 12:42:30 PDT 1994 Message Number 0615
******************************************************************************
Author: Miranda Chin/CIGNET
Subject: Westford/WFRD Antenna Test Updates
Subject: Westford/WFRD Antenna Test Updates
Between 1745 and 1800 UT on 1994 May 19, the MIT group placed a
absorber material on top of the concrete pillar, covering the pillar
and the steel plate embedded in it as part of the JPL-type FLINN
monument, and below the chokering attached to the Dorne-Margolin
antenna. Tracking was not terminated during the installation of
the absorber, and the chokering/antenna assembly was not moved.