[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
[IGSMAIL-1797] ALBH
- Subject: [IGSMAIL-1797] ALBH
- From: Michael Schmidt
- Date: Thu, 29 Jan 1998 12:10:59 PST
IGS Electronic Mail Thu Jan 29 12:10:59 PST 1998 Message Number 1797
******************************************************************************
Author: Michael Schmidt
Subject: ALBH: - clock change
***************************************************************************
GEOLOGICAL SURVEY OF CANADA
WESTERN CANADA DEFORMATION ARRAY
GPS TRACKER ADVISORY
GPS TRACKER ID: ALBH
DOMES No.: 40129-M003
CDP No. n/a
MONUMENT No. 927000
LOCATION: Albert Head (Victoria, B.C.), Canada
ADVISORY: Please be advised of the following change at ALBH:
Effective 98/01/27 (98.027) 18:20UT:
ALBH rubidium clock replaced by a cesium clock.
An updated site log has been submitted.
Please address any questions to:
_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/
WEB URL: <http://www.pgc.nrcan.gc.ca>
Michael Schmidt, P.Eng. Tel (250) 363-6760
Pacific Geoscience Centre FAX (250) 363-6565
Geological Survey of Canada internet: schmidt @ pgc.nrcan.gc.ca
P.O. Box 6000
9860 West Saanich Rd.
Sidney, B.C.
Canada V8L 4B2 |||||| /\ ||||||
|||||| _|\| |/|_ ||||||
|||||| \ / ||||||
|||||| >______< ||||||
|||||| | ||||||
_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/_/
[Mailed From: Michael Schmidt <schmidt @ pgc.emr.ca>]