[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[IGSMAIL-2181] Z18 at Graz in regular operation



******************************************************************************
IGS Electronic Mail      Tue Mar  2  0:27:31 PST 1999      Message Number 2181
******************************************************************************

Author: Peter Pesec
Subject: Z18 at Graz in regular operation

Z18 at Graz (site: GRAB, DN: 11001M004) started again continuous
observations doy 60, 18 UT) using GPSBASE software. During the previous
days the Z18 was intermediately operated by the Ashtech Geodetic Base
Station Software GBSS.
Attention: GBSS shows format overflows in RINEX after some continuous
operating days, which can not be handled by the Hatanaka compression.

Peter Pesec
-- 
----------------------------------------------------------------
Dr. Peter Pesec                     Tel : +43-316-467350
Space Research Institute,           Fax : +43-316-467356
Department Satellite Geodesy        Mail: peter.pesec @ oeaw.ac.at
Austrian Academy of Sciences
Lustbuehelstrasse 46, A-8042 Graz
----------------------------------------------------------------


[Mailed From: "Dr. Peter Pesec" <peter.pesec @ oeaw.ac.at>]