[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
[IGSMAIL-2181] Z18 at Graz in regular operation
- Subject: [IGSMAIL-2181] Z18 at Graz in regular operation
- From: Peter Pesec
- Date: Tue, 2 Mar 1999 0:27:31 PST
******************************************************************************
IGS Electronic Mail Tue Mar 2 0:27:31 PST 1999 Message Number 2181
******************************************************************************
Author: Peter Pesec
Subject: Z18 at Graz in regular operation
Z18 at Graz (site: GRAB, DN: 11001M004) started again continuous
observations doy 60, 18 UT) using GPSBASE software. During the previous
days the Z18 was intermediately operated by the Ashtech Geodetic Base
Station Software GBSS.
Attention: GBSS shows format overflows in RINEX after some continuous
operating days, which can not be handled by the Hatanaka compression.
Peter Pesec
--
----------------------------------------------------------------
Dr. Peter Pesec Tel : +43-316-467350
Space Research Institute, Fax : +43-316-467356
Department Satellite Geodesy Mail: peter.pesec @ oeaw.ac.at
Austrian Academy of Sciences
Lustbuehelstrasse 46, A-8042 Graz
----------------------------------------------------------------
[Mailed From: "Dr. Peter Pesec" <peter.pesec @ oeaw.ac.at>]