[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
[IGSMAIL-5129]: NGS/NOAA Operational Center power outage
- To: igsmail @ igscb.jpl.nasa.gov
- Subject: [IGSMAIL-5129]: NGS/NOAA Operational Center power outage
- From: "Miranda Chin" <Miranda.Chin @ noaa.gov>
- Date: Wed, 30 Mar 2005 11:04:45 -0500
- Sender: owner-igsmail
- User-agent: Mozilla/5.0 (Windows; U; Windows NT 5.0; en-US; rv:1.7.2) Gecko/20040804 Netscape/7.2 (ax)
******************************************************************************
IGS Electronic Mail 30 Mar 08:04:47 PST 2005 Message Number 5129
******************************************************************************
Author: NGS/NOAA Operational Center
The power to the NGS office building will be turned off on Saturday,
April 2, 2005 by the
local power company for a mandatory maintenance on building systems. To
ensure a
smooth transition, NGS system administrators will start shutting down
servers and PCs
at 1pm, Friday, April 1. Around noon, Monday, April 4, most computer
systems should be up.
Internet connection and emails will not be available during this time
period.
We apologize for the inconvenience this may cause.