[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
[IGSSTATION-1183]: CHUR: Maser Problems
******************************************************************************
IGS Station Mail 13 Oct 07:25:00 PDT 2006 Message Number 1183
******************************************************************************
Author: Brian Donahue
ADVISORY: Station CHUR experienced a Hydrogen Maser failure just after
19ut on October 12th. The receiver was switched to the internal
oscillator on October 13th at 13:51ut. An attempt will be made to
restart the Maser later today and an update will be sent if the receiver
is switched back to the Maser. A new site log will be uploaded to the
Central Bureau shortly.
Sorry for any inconvenience this might have caused and best regards,
Brian