[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[IGSSTATION-1965]: BREW: small change/addition to antenna cable



******************************************************************************
IGS Station Mail          14 Dec 13:55:05 PST 2007      Message Number 1965
******************************************************************************

Author: Oivind Ruud, UNAVCO

Dear Colleagues,

In order to make our receiver at the NRAO-Brewster, WA (BREW) IGS station fit on an assigned equipment shelf the addition of an N-type, 90 degree (elbow) connector was necessary. The elbow connector was installed at the receiver end of the antenna cable today, December 14th (2007.348) 18:37 UTC.

A new log has been submitted to the IGS-CB with this change recorded in section 4.2.

We apologize for any inconvenience this may have caused.

Maintenance and operations of the BREW station is a collaborative effort supported by JPL, UNAVCO, and the Brewster NRAO VLBA Station with funding provided by NASA's Earth Surface and Interior Focus Area - Science Mission Directorate.

Best regards,

-Oivind Ruud