[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[IGSSTATION-2711]: AREQ: change in receiver clock steering



******************************************************************************
IGS Station Mail          09 Dec 09:42:45 PST 2008      Message Number 2711
******************************************************************************

Author: Oivind Ruud, UNAVCO

Dear Colleagues,

Please be aware that the external reference (Rubidium) at the Arequipa, Peru (AREQ) IGS station is no longer locked to the ASHTECH UZ-12 receiver, and the receiver is being steered internally starting today, December 09th (2008.344). An updated log has been submitted to the IGS-CB.

We apologize for the inconvenience this may cause.

Maintenance and operations of the AREQ station is a collaborative effort supported by JPL, UNAVCO, and The Arequipa Tracking Station, with funding provided by NASA's Earth Surface and Interior Focus Area - Science Mission Directorate.

Best regards,

-Oivind Ruud