IGS Station: drao

Station Information

IGS Reference Frame SiteAn IGS Reference Frame site

current site log
    drao_20090519.log
   older site logs below

websites
http://gsc.nrcan.gc.ca/geodyn/wcda/index_e.php
site photos
(none found)
Most Recent Mail
   3256    13Aug2009 Brian Schofield   Subject: DRAO: data outage                   
    
Older Mail (below)
Recent data quality plots (documented here) 45 day averages and standard deviations
drao in blue
all other IGS sites in red
Recent daily number of observations


Daily number of observations


Recent cycle slips X1000/observations


Cycle slips X1000/observations


Recent RMS MP1 (L1 Multipath)


RMS MP1 (L1 Multipath)


Recent RMS MP2 (L2 Multipath)


RMS MP2 (L2 Multipath)


Position residuals (cumulative minus weekly)
for the past 2 years (details)
Most recent week
drao in blue
all other IGS sites in red
North Residuals


North Residuals


East Residuals


East Residuals


Height Residuals


Height Residuals


Day Boundary Clock Discontinuities (details)
Final


Rapid


Recent daily data file latency performance (details)
Data seen at: CDDIS,IGN,SIO
90-day averages and standard deviations
drao in blue
all other IGS daily sites in red
Latency of each daily file


Average latency of recent daily files


Recent hourly data file latency performance (details)
Data seen at: ,CDDIS,SIO
3-day averages and standard deviations
drao in blue
all other IGS hourly sites in red
Latency of each hourly file


Average latency of recent hourly files


Usage in IGS products during the past 90 days (details)

  CODE NRCan ESOC GFZ GOP JPL MIT NOAA/NGS SIO USNO
Final Orbit: X X X     X X X X  
Rapid Orbit:   X X         X X X
Ultra Orbit:   X X X         X  
Final Clock: X X X     X X      
Rapid Clock:                    
Final Trop:                    
NRT Trop:                    

  CODE ESOC JPL UPC
Final Iono: X X X X
Rapid Iono:        

Older Mail
3078    20May2009 Michael Schmidt   Subject: DRAO: Data submission 2009-05-17, 20
3074    19May2009 Michael Schmidt   Subject: DRAO: Receiver replaced 2009-05-19 -
3073    19May2009 Michael Schmidt   Subject: DRAO: Receiver replaced 2009-05-19  
2757    05Jan2009 Michael Schmidt   Subject: DRAO: 2009-D005: snow cleared from a
2661    19Nov2008 Lisa Nykolaishen  Subject: DRAO: Updated site log
2400    25Jul2008 Brian Schofield   Subject: DRAO - data submission
2382    15Jul2008 Brian Schofield   Subject: DRAO: data outage
2366    09Jul2008 Michael Schmidt   Subject: DRAO / WILL: CDDIS archive update
2337    25Jun2008 Michael Schmidt   Subject: DRAO: Data Outage 2008 D176-177
1922    20Nov2007 Michael Schmidt   Subject: DRAO: Clock Change 2007-11-20T18:23Z
1745    29Aug2007 Brian Schofield   Subject: DRAO: resumption of data flow
1743    28Aug2007 Brian Schofield   Subject: DRAO: data loss
1524    17Apr2007 Brian Schofield   Subject: DRAO: data outage
1516    15Apr2007 Brian Schofield   Subject: DRAO: Data loss 2007-04-14
1154    03Oct2006 Michael Schmidt   Subject: DRAO: Permanent Data Gap 2006-10-03
598     31Aug2005 Michael Schmidt   Subject: DRAO: New Receiver / Firmware effect
588     22Aug2005 Michael Schmidt   Subject: DRAO: Data resubmission for 2005-08-
520     27Jun2005 Brian Schofield   Subject: DRAO: Data Resubmitted D176
485     20May2005 Michael Schmidt   Subject: DRAO: Clock Adjustment 2005-05-19
444     14Apr2005 Brian Schofield   Subject: DRAO: Data loss D102,103
416     22Mar2005 Michael Schmidt   Subject: DRAO: Updated Site Log Submitted
414     20Mar2005 Michael Schmidt   Subject: DRAO: Change in External Clock
400     10Mar2005 Brian Schofield   Subject: DRAO: Data Resubmitted D068; data qu
397     07Mar2005 Brian Schofield   Subject: DRAO: data quality
377     18Feb2005 Brian Schofield   Subject: DRAO: Data loss D044
167     21Sep2004 Brian Schofield   Subject: DRAO: Data Resubmitted D264
85      15Jul2004 Michael Schmidt   Subject: DRAO: Antenna Cable Changed 2004-07-
76      12Jul2004 Michael Schmidt   Subject: DRAO: Scheduled Maintenance D194-195
5195    29Aug2005 Herb Dragert      Subject: DRAO: Rinex file update for Day 240 
4332    01Apr2003 Michael Schmidt   Subject: DRAO: Communication Outage
4235    17Jan2003 Francois Lahaye   Subject: DRAO: Hydrogen Maser Adjustment
3895    24May2002 Michael Schmidt   Subject: DRAO: scheduled power outage May 29,
3841    20Apr2002 Michael Schmidt   Subject: DRAO - gap(s) in data D110
3743    17Feb2002 Michael Schmidt   Subject: DRAO: D046 Re-submitted
3378    12Jun2001 Michael Schmidt   Subject: DRAO: Clock change 
3376    11Jun2001 Michael Schmidt   Subject: DRAO: Clock change scheduled for D16
3128    06Dec2000 Michael Schmidt   Subject: DRAO: firmware upgrade
3019    16Sep2000 Michael Schmidt   Subject: DRAO: Data D259 re-submitted
2793    11Apr2000 Michael Schmidt   Subject: Data resubmission for DRAO, DUBO, FL
2789    08Apr2000 Michael Schmidt   Subject: DRAO: D098 data resubmission
2788    07Apr2000 Michael Schmidt   Subject: DRAO: D097 Data resubmission
2635    17Dec1999 Michael Schmidt   DRAO, HOLB data resubmission                 
2633    15Dec1999 Michael Schmidt   DRAO                                         
2622    12Dec1999 Herb Dragert      1hr data files for DRAO                      
2611    06Dec1999 Michael Schmidt   DRAO                                         
2514    07Oct1999 Michael Schmidt   DRAO                                         
2065    12Nov1998 Michael Schmidt   DRAO                                         
1963    24Jul1998 Michael Schmidt   DRAO                                         
1962    24Jul1998 Michael Schmidt   DRAO                                         
1920    08Jun1998 Michael Schmidt   DRAO                                         
1914    04Jun1998 Michael Schmidt   DRAO Outage Start D155                       
1749    05Dec1997 Michael Schmidt   DRAO Outage Update + New Clock               
1741    03Dec1997 Michael Schmidt   DRAO                                         
1375    28Jun1996 Michael Schmidt   DRAO                                         
1359    19Jun1996 Michael Schmidt   ALBH, DRAO Advisory                          
1159    13Dec1995 Stephen Delahunt  ALBH & DRAO Data Resubmission                
1152    07Dec1995 Stephen Delahunt  ALBH & DRAO Late Data Submission             
1151    07Dec1995 Stephen Delahunt  ALGO, ALBH, DRAO, STJO & YELL Data Submission
1043    15Aug1995 Stephen Delahunt  Resubmission of DRAO Data for 95Aug14 (DOY 22
1042    15Aug1995 Stephen Delahunt  95aug14 DRAO File Contains WRONG Data        
1011    17Jul1995 Michael Schmidt   DRAO firmware upgrade                        
935     13Apr1995 Bhoj Shivkumar /  DRAO FOR DAY102                              
932     12Apr1995 Michael Schmidt   DRAO Receiver / firmware upgrade             
918     29Mar1995 Michael Schmidt   DRAO Data Shortage DOY 087                   
723     06Sep1994 Mike Schmidt      DRAO Data Outage                             
721     06Sep1994 Stephen Delahunt  DRAO ...missing data                         
633     15Jun1994 Stephen Delahunt  Data for ALBH ALGO DRAO STJO YELL            
543     22Mar1994 Mike Schmidt      Data outade(s) at ALBH and DRAO              
531     08Mar1994 Mike Schmidt      DRAO Outage / Firmware Change                
515     28Feb1994 Mike Schmidt      DRAO outage - correction                     
514     28Feb1994 Mike Schmidt      DRAO data loss / email problems              
499     21Feb1994 Mike Schmidt      Update to DRAO Site Info Log                 
490     16Feb1994 Stephen Delahunt  DRAO Data Day 041 & 042 Resubmitted          
487     15Feb1994 Bhoj Shivkumar    DRAO for day043 resubmitted                  
486     13Feb1994 Stephen Delahunt  DRAO                                         
485     11Feb1994 Mike Schmidt      Receiver Change for DRAO (Penticton, Canada) 
429     06Jan1994 Mike Schmidt      DRAO Clock Change / Site Log Update          
412     13Dec1993 Mike Schmidt      DRAO                                         
391     30NOV1993 Mike Schmidt      DRAO and ALBH Site Descriptions              
370     11NOV1993 Herb Dragert      Meenix 7.5 installation at DRAO (Penticton, C
358     28OCT1993 Herb Dragert      DRAO & ALBH/ Problems and hardware changes at
251     06MAY1993 Mike Schmidt      Software Upgrade at DRAO                     
217     15MAR1993 Herb Dragert      Clock problem at station DRAO (Penticton, Can
213     09MAR1993 Mike Schmidt      Clock Problem at DRAO                        
206     24Feb1993 Pierre Heroux     Penticton (DRAO) data correction             
184     27Jan1993 Herb Dragert      Rogue firmware upgrade at DRAO (Penticton, BC
175     15JAN1993 Mike Schmidt      Antenna height at DRAO (Penticton)           
167     11JAN1993 Mike Schmidt      GPS tracker DRAO (Penticton, Canada)         
Older Site Logs
drao_20090105.log
drao_20081113.log
drao_20071120.log
drao_20060228.log
drao_20050831.log
drao_20050322.log
drao_20040715.log
drao_20020403.log
drao9910.log
drao9909.log
drao9907.log
drao9906.log
drao9806.log
drao9805.log
drao9801.log
drao9712.log
drao9507.log
drao9506.log
drao9504.log
drao9403.log
drao9402.log
drao9401.log
drao9310.log
drao0204.log
drao0106.log
drao0012.log

| HOME || ABOUT IGS || ORGANIZATION || FAQs || FTP ARCHIVES || WEBSITE INDEX |

This page last updated: 23 Nov 2009 19:01:27
Please send comments about this website to: IGS Central Bureau.